Technology Installation Services installed an AMP NETCONNECT category 6 UTP scheme for Staffordshire University's Octagon Building.
The project included stripping out the existing category 3 infrastructure in the learning centre and lecture theatres. This was replaced with category 6 cabling in the learning centre and with category 5e cabling in lecture theatres, allowing the existing containment infrastructure to be used.
More than 700 network points were installed from four cabinet locations along with new 0M3 multi-mode fibre-optical cable.
The installation was carried out during the university's summer holiday period.
AMP NETCONNECT installations are covered by a 25-year system warranty.